Skip to product information
Brand: YOLIFE
Capacity: 1.3 pounds
Color: Grey and Black
Product Dimensions: 8.8"D x 3.9"W x 6.1"H
Special Feature: Permanent Filter
- 1.☕️ Elegant and timeless design: Our glass French press complements any kitchen decor. Its transparency adds sophistication to your morning routine. Perfect for home or travel.
- 2.☕️ Pure and authentic coffee taste: Glass French presses preserve natural oils and flavors, delivering a rich, sediment-free taste. Experience unparalleled, authentic coffee flavor with this glass French press.
- 3.☕️ Durable and long-lasting: Made of high-quality borosilicate glass, this French press is resistant to thermal shock and can withstand high temperatures, ensuring long-lasting use.
- 4.☕️ Easy to clean: Our glass French press is designed for hassle-free cleaning. Enjoy a hassle-free cleaning experience, perfect for busy mornings or travel.
- 5.☕️ 4-Level Filtration: Our French press uses a 4-level filtration systems consisting of 2 stainless steel screens, a spring-loaded base that seals the edges during pressing, and a lid strainer to trap any grounds.. Enjoy a smoother, more flavorful coffee experience with this glass French press.
21 oz Heat-resistant Borosilicate Glass French Press Coffee Maker H259
Sale price
$4.99
Regular price $12.99
Shipping calculated at checkout.